Landscapers · Retaining Walls

Retaining wall quotes that price the part underground

Quote retaining walls with excavation, base, drainage, and block as separate signed line items — show clients why the right wall costs what it costs.

  • 3 free quotes a month
  • No credit card
  • 2-minute setup

Green Valley Landscaping

Quote · ready to sign

QUOTE

Block Retaining Wall — 40 ft × 3 ft

Excavation and footing trench40 linear ft$1,400.00
Compacted gravel base40 linear ft$1,100.00
Segmental block wall, supplied and built120 face sq ft$3,900.00
Drainage pipe and gravel backfill40 linear ft$900.00
Cap stones, adhered40 linear ft$740.00
Deposit for block order: $2,000.00$8,040.00
Accept & Sign Pay Deposit
What your client sees — with your logo, brand color, and your own payment link.

The retaining walls quoting problem

Half the cost of a good wall is invisible when it's done — excavation, base, drainage, backfill. If your quote is one number, the client compares it to a stack-and-go bid that skips the geogrid and fails in three winters. Itemizing the underground work is how honest wall builders win against cheap ones.

From job site to signed quote in minutes

No spreadsheets, no evenings at the kitchen table. Three steps, usually done before you leave the driveway.

  1. STEP 1

    Describe the job

    Type it like a text message — or snap a photo of the yard. Square footage, access, what they want.

  2. STEP 2

    AI drafts the price

    Realistic, line-itemized pricing for labor, materials, and haul-away in seconds. Edit any number.

  3. STEP 3

    Client signs & pays

    They open a link, sign with their name, and pay your deposit — straight into your own account.

I lost wall jobs for years to guys who skip the drainage. Now the quote shows the drainage line and clients ask the other bidder where his is.

Hardscape & retaining wall specialist (illustrative example)

Common questions

How do I explain base and drainage costs?

Each gets its own line item with real numbers. The optional notes field is where builders add one sentence on why walls without drainage fail — the quote does the educating.

Can I require a large deposit for materials?

Yes — set any amount. Block orders are commonly 30–40% of the job, and the deposit button sends funds straight to your own account, never through QuoteCraft.

Does QuoteCraft handle engineered walls?

For walls needing an engineer's stamp, quote your build scope and note the engineering as a client-provided item or its own line. The quote records whatever scope you define.

Send your first retaining walls quote today

Free to start — 3 quotes a month, no credit card required.

Start quoting free
Start free — no credit card